MIDTRANS SHIPPING AND SERVICES · Established 1998Syria, UAE, Dubai, Jebel Ali, China, Turkey, Europe

Market update

Suez Canal traffic and revenue rebounded in August 2026

Carriers are returning to the Red Sea route, and August's Suez figures show it — a useful signal for anyone moving cargo between Asia and the Mediterranean.

1,358 transits — +27% YoYRevenue USD 567.1M — +56.7%Net tonnage 68.3M tonnes

Published · Midtrans Shipping And Services

Reviewed by Khaldoun Al-Khouli, General Manager

Traffic

Suez transits and revenue both rebounded

The Suez Canal recorded 1,358 vessel transits in August 2026, up 27% from 1,070 a year earlier, with net tonnage of 68.3 million tonnes and revenue of USD 567.1 million — a 56.7% rise on the USD 326 million of August 2025. The figures were given by Suez Canal Authority chairman Osama Rabie on 20 September 2026.

  • 1,358 transits in August 2026 (+27% YoY)
  • Revenue USD 567.1M (+56.7% YoY)
  • Net tonnage 68.3M tonnes

Why

Why traffic is coming back

The authority attributes the recovery to shipping lines resuming Red Sea routing after the earlier regional disruption that had pushed traffic around the Cape of Good Hope. Traffic remains below pre-crisis peaks, so routing should still be confirmed per sailing.

  • Lines resuming Red Sea routing (SCA)
  • Earlier disruption had diverted traffic via the Cape
  • Still below pre-crisis peaks — confirm per sailing

Clearing cargo into Egypt? We coordinate the ACID and NAFEZA steps with the Egyptian consignee's broker.

Get a quote

What it means

What a busier Suez means for your cargo

For cargo owners, a busier and more predictable Suez supports the shorter Asia-Mediterranean transit and steadier schedules for Egypt-routed and Mediterranean-bound shipments — provided the routing is confirmed for each sailing.

  • Supports shorter Asia-Mediterranean transit
  • Steadier schedules for Egypt and Med cargo
  • Confirm routing per sailing

Egypt entry

Egyptian arrival: ACID and NAFEZA

Moving cargo into Egypt also means the advance-registration steps — ACID and NAFEZA — completed before arrival. MIDTRANS SHIPPING AND SERVICES coordinates the sea leg, the Egyptian arrival file and customs clearance, including those steps, so a routing choice becomes a delivered shipment.

  • ACID advance cargo ID required before arrival
  • NAFEZA single-window registration
  • MIDTRANS handles the arrival file end to end

MIDTRANS

How MIDTRANS moves your Egypt cargo

Whether your cargo transits Suez or clears into Egypt, MIDTRANS plans the routing and manages the arrival and customs process. The figures above are market data as reported on the dates cited, not MIDTRANS rates — ask us for a quote on your lane.

Share this article

FAQ

Frequently asked questions

How much did Suez Canal traffic rise in August 2026?

The Suez Canal recorded 1,358 vessel transits in August 2026, up 27% from 1,070 a year earlier, with revenue of USD 567.1 million — a 56.7% rise on August 2025 — per SCA chairman Osama Rabie (20 September 2026).

Why is traffic returning to the Suez Canal?

The Suez Canal Authority attributes the recovery to shipping lines resuming Red Sea routing after the earlier disruption that had pushed traffic around the Cape of Good Hope. Traffic is still below pre-crisis peaks, so confirm routing per sailing.

What do I need to import into Egypt?

Egyptian imports require advance registration through ACID and NAFEZA before arrival. MIDTRANS coordinates the sea leg, the Egyptian arrival file and customs clearance — including those steps — for Egypt-routed cargo.

Which cargo gains most from a busier Suez Canal?

Asia-Mediterranean cargo and shipments bound for Egypt or other Mediterranean ports. A busier, more predictable canal supports the shorter Asia-Mediterranean transit and steadier schedules, provided the routing is confirmed for each sailing.

When must ACID and NAFEZA be completed for cargo entering Egypt?

Before the cargo arrives. ACID is the advance cargo identification and NAFEZA the single-window registration; MIDTRANS coordinates both as part of the Egyptian arrival file, together with the sea leg and customs clearance.

Are the Suez figures in this article MIDTRANS freight rates?

No. They are canal traffic and revenue figures as reported on the dates cited, not MIDTRANS rates. For a price on your lane, ask the operations desk for a quote.

Shipping via Suez or into Egypt?

Tell us your route and cargo — MIDTRANS will plan the sea leg and coordinate the Egyptian arrival file, ACID and NAFEZA with the consignee's broker.

TrackQuoteChat with us