MIDTRANS SHIPPING AND SERVICES · Established 1998Syria, UAE, Dubai, Jebel Ali, China, Turkey, Europe

Project cargo services

Project Cargo and Heavy-Lift Shipping

Midtrans Shipping And Services provides specialized project cargo, heavy-lift shipping, and oversized cargo transport for industrial, energy, infrastructure, petrochemical, manufacturing, and construction projects across the UAE, Syria, Egypt, Turkey, Europe, and the wider Middle East.

Heavy-lift shippingOversized cargo transportDoor-to-door project logistics
RouteFeasibility and access review
Lift / loadWeight, dimensions and handling check
DocumentsCustoms and permit preparation
MIDTRANS project cargo — heavy-lift unit loaded onto a RoRo vessel

Our approach

Project Logistics Built on Operational Experience

MIDTRANS reviews project cargo movements around actual dimensions, weight, lifting points, packing method, route feasibility, port or border constraints, customs exposure, permits, site access and final delivery conditions. The service is suitable for industrial machinery, production-line components, electrical equipment, oversized units and documentation-heavy cargo after technical and operational review.

  • Industrial machinery
  • Production-line components
  • Electrical equipment
  • Oversized units
  • Documentation-heavy cargo

Scope

End-to-End Project Cargo Management

Every project is planned around the cargo dimensions, weight, lifting requirements, route restrictions, port capabilities, customs procedures, and final-site conditions.

  • Cargo surveys and technical planning
  • Route and bridge assessments
  • Heavy-lift and oversized road transport
  • Breakbulk and project cargo shipping
  • Ro-Ro transport using MAFI roll trailers
  • Vessel and specialised equipment chartering
  • Air freight for urgent and high-value machinery
  • Dangerous goods and ISO tank coordination
  • Customs clearance and import documentation
  • Port handling, discharge supervision, and final delivery

Heavy cargo

Heavy and Oversized Cargo Solutions

Heavy and oversized cargo may require specialised trailers, route checks, lifting plans, port handling review, survey support, permit assessment and careful site coordination. The final method depends on verified cargo measurements, available equipment, route conditions, provider acceptance and safety review.

  • Specialised trailer review
  • Route checks
  • Lifting plan review
  • Port handling review
  • Site coordination

Inquiry profiles

Project cargo inquiry profiles

Project cargo inquiries may involve manufacturing equipment, construction materials, power and electrical equipment, industrial spares, plant components, telecommunications equipment, oil and gas support cargo, agricultural machinery and other commercial project loads. Suitability is confirmed after cargo, route, document and compliance review.

  • Petrochemical and chemical cargo review
  • Power generation and electrical infrastructure
  • Ceramic production lines
  • Pharmaceutical manufacturing
  • Aluminium and steel industries
  • Soap and detergent production
  • Telecommunications networks
  • Railway equipment
  • Submarine and telecommunications cables
  • Oil, gas, agricultural, and industrial machinery

Coordination

Provider and specialist coordination

Project cargo may require coordination with carriers, port handlers, trucking providers, lifting teams, surveyors, brokers, appointed specialists and customer technical teams. Any provider, carrier, equipment or specialist arrangement is reviewed for the specific movement and does not imply a permanent partnership, agency, exclusive representation or fixed acceptance.

  • Carrier review
  • Port handling review
  • Trucking provider review
  • Survey or permit support
  • Customer technical coordination
MIDTRANS project cargo in transit on a lowbed trailer

Regional reach

Project Cargo Across the Middle East

From Jebel Ali, Dubai, European ports, Turkey, China, India, and the United States, MIDTRANS coordinates project cargo through major regional gateways, including Tartous, Latakia, Mersin, Aqaba, Jebel Ali, Alexandria, Port Said, Damietta, and Sokhna. The selected route is based on cargo specifications, port capability, transit time, customs requirements, operational risk, and total delivered cost.

  • Tartous
  • Latakia
  • Mersin
  • Aqaba
  • Jebel Ali
  • Alexandria
  • Port Said
  • Damietta
  • Sokhna

Get started

Plan Your Project Cargo Movement

Whether the requirement involves a single oversized machine, a complete production line, a heavy electrical transformer, specialised industrial equipment, or a multimodal project shipment, MIDTRANS develops a practical transport plan from origin to final site. Share the cargo dimensions, weight, origin, destination, drawings, packing details, and required delivery date. Our project logistics team will review the shipment and prepare the appropriate transport solution.

  • Single oversized machine
  • Complete production line
  • Heavy electrical transformer
  • Specialised industrial equipment
  • Multimodal project shipment

Operations review

Operations review and formal confirmation

HS Code direction, customs duties, taxes, customs clearance requirements, route feasibility, permits, lifting arrangements, operator handling, and destination acceptance should be confirmed with the competent customs authority, the appointed customs broker, and the relevant operating parties before shipment. MIDTRANS operations should also review the real cargo dimensions, weight, lifting points, drawings, packing method, origin, destination, site access, and delivery sequence before confirmation.

  • Website information guidance
  • Operations review
  • Formal customs or broker confirmation

Our process

How we move project cargo

We move heavy, oversize and out-of-gauge cargo for industrial, infrastructure and machinery projects. We survey the route, check bridge and axle limits, arrange the permits and escorts each authority requires, and specify the lifting gear and trailers that reach the site.

  • Oversize cargo
  • Route study
  • Permits
  • Site delivery

Official confirmation

Specialist review and official confirmation

HS Code, duty, tax, and customs clearance information must be verified with the official customs authorities and the appointed customs broker before shipment. Operator handling, route availability, and operational scope require MIDTRANS operations review.

  • Informational website guidance
  • Operations review
  • Official customs or broker confirmation

FAQ

Frequently asked questions

Clear answers for customers reviewing MIDTRANS services, routes, documents, and official support channels.

What information is needed for project cargo review?

Share cargo drawings or photos, dimensions, gross weight, lifting points, packing method, origin, destination, site access notes, readiness date, required delivery context and available documents. MIDTRANS reviews the technical and operational scope before proposing a movement plan.

Can project cargo acceptance be confirmed from a website request?

No. Project cargo acceptance depends on cargo measurements, lifting and securing requirements, route feasibility, port or border constraints, equipment availability, permits, provider acceptance, customs documents and compliance review.

Which project cargo may need special planning?

Heavy, oversized, fragile, high-value, regulated, out-of-gauge, industrial, construction, power, telecommunications or plant-related cargo may need special route, equipment, handling and documentation review before movement.

What paperwork can support project cargo review?

Typical documents may include commercial invoice, packing list, technical specifications, dimensions and weight sheet, drawings, photos, serial or model information, certificates, permits and safety data where relevant. Exact requirements are confirmed case by case.

How are project cargo pricing factors reviewed?

Pricing depends on size, weight, route, equipment, handling, permits, escorts, surveys, port or border access, site access, documentation and timing. MIDTRANS prepares a reviewed quotation instead of publishing fixed rates.

What affects project cargo transit timing?

Timing depends on route feasibility, equipment availability, permit review, carrier or provider schedules, customs and border requirements, port handling, weather or access constraints, and site readiness. MIDTRANS can coordinate and follow up, but does not promise a set timetable before review.

Next step

Discuss a shipment, customs question, or logistics requirement

Share the route, cargo, documents, and timing once. MIDTRANS can review the same structured request through WhatsApp, email, or the contact desk.

01Route

Origin, destination, pickup point, delivery point, and preferred freight mode.

02Cargo

Commodity, weight, volume, documents, readiness date, and customs questions.

03Review

Operations follow up through official MIDTRANS channels before any commitment.

Egypt corridor

Project cargo through Egyptian ports

Out-of-gauge and heavy-lift pieces are matched to the Egyptian port that can actually work them, which is rarely the port nearest the consignee. See freight forwarding in Egypt.

TrackQuoteChat with us