Every project starts with a cargo list: dimensions, weights and centres of gravity, piece by piece.
Project cargo from the UAE
Project Cargo and Heavy Equipment in the UAE
We plan and move project cargo into, out of and through the UAE: oil and gas equipment, heavy construction machinery, industrial plant and complete factories. Each move starts from the dimensions and weights of the pieces and ends at the site. In between are the port, the vessel or the trailer, the permits, the lifting and the customs clearance, handled from our Dubai and Jebel Ali offices.
Jebel Ali, Khalifa Port, Fujairah, Mussafah, Ruwais, sites across the GCC
Dimensions, weights and lifting points of every piece before a trailer or a vessel is chosen.
Abnormal-load permits and escorts arranged for each emirate and country on the route.
Import, temporary admission, re-export or transit decided before the first piece moves.
International Shipping & Customs Assistant
MIDTRANS Operations Desk
Team review before pricing or operationsWe pick the port, the vessel type and the trailer from that list, not the other way round.
Customs treatment is settled before shipment, because heavy pieces are expensive to keep waiting.
Oil and gas
Oil and gas equipment through the UAE
The UAE is a base for the oil and gas industry of the whole region. Equipment is supplied from Dubai and Jebel Ali, Abu Dhabi's Mussafah and Ruwais, and the Fujairah oil terminal area. We move pipes, valves, wellhead and drilling equipment, pumps, compressors, pressure vessels and spare parts to and from rigs, plants and yards in the UAE and the GCC. Some of these goods are dangerous or need special packing; others are oversized or very heavy. Our wider oil and gas work is described on our oil and gas page.
- Pipes, valves and wellhead equipment
- Pumps, compressors and pressure vessels
- Drilling equipment and spare parts
- Yards and sites in the UAE and the GCC
Construction
Heavy construction machinery
Excavators, loaders, cranes, dozers, rollers, generators and batching plants move between projects in the UAE, across the GCC, and to rebuilding projects in the region. Small machines go on flatbeds or in open-top and flat-rack containers; heavy machines go on lowbeds, or by ro-ro or break-bulk at sea. Used machinery needs to be cleaned before export, because many destinations reject soil and plant material. We check the machine's papers, dimensions and weight before we choose the transport. See also construction logistics.
- Excavators, loaders, cranes and rollers
- Flatbed, lowbed, ro-ro or flat rack
- Machines cleaned before export
- Papers and dimensions checked first
Factories
Factory relocation and industrial plant
Moving a factory means moving a production line in the order it will be rebuilt. Before dismantling, every machine and part is listed, photographed and tagged, and the drawings are kept with the cargo list. The pieces are packed or crated for the trip, loaded in an order that matches the reassembly, and shipped by container, flat rack or break-bulk. Most of the cost is in planning and handling, not in freight. We work with riggers and the plant's engineers so the line arrives complete. See industrial equipment.
- Inventory, photographs and tagging
- Packing and crating for the trip
- Loading in reassembly order
- Work with riggers and engineers
The plan
Route survey, permits and lifting
An oversized load needs a road it can actually use. We check bridges, overhead lines, roundabouts and turning radii where the load requires a route survey, and apply for abnormal-load permits in every emirate and country on the way, with escorts where they are required. At the port we plan the lift: crane capacity, spreader beams, lashing and the stowage on the vessel. For the heaviest pieces we use modular trailers or self-propelled transporters supplied by specialist heavy-haul partners. Photographs from past moves are on our project cargo gallery.
- Route survey where the load needs it
- Abnormal-load permits and escorts
- Lift and lashing plans at the port
- Modular trailers for the heaviest pieces
Customs
Customs for project cargo
Project cargo can be imported for a UAE project, admitted temporarily for a job and taken out again, re-exported to another country, or moved in transit across the UAE. Each treatment has its own declaration, guarantee and documents, and some projects carry duty exemptions that must be approved before the goods arrive. A missing approval is expensive when it holds a 100-tonne piece at the port. We settle the treatment with the client at the planning stage and clear the cargo at Jebel Ali, at the airports or at the border.
- Import for a UAE project
- Temporary admission and re-export
- Transit across the UAE
- Exemptions approved before arrival
FAQ
Frequently asked questions
Do you handle oil and gas equipment in the UAE?
Yes. We move pipes, valves, wellhead and drilling equipment, pumps, compressors and pressure vessels to and from sites in the UAE and the GCC.
Can you relocate a factory from Dubai?
Yes. We list and tag the machines, pack and crate them, load them in reassembly order and ship them by container, flat rack or break-bulk, working with riggers and the plant's engineers.
Which ports do you use for heavy cargo?
Mainly Jebel Ali, Khalifa Port in Abu Dhabi and Fujairah, chosen by the vessel, the size of the pieces and the site.
Do you arrange permits for oversized loads?
Yes. We apply for abnormal-load permits in each emirate and country on the route, with escorts and a route survey where they are required.
Can heavy equipment enter the UAE temporarily for a project?
Yes, under temporary admission with a guarantee, and it leaves again on re-export. The treatment is agreed before the equipment arrives.
What do you need to quote a project move?
A cargo list with the dimensions, weights and lifting points of each piece, the pickup address, the site, and the date the cargo is ready.
Next step
Plan a project move
Send the cargo list, the pickup and the site. We plan the route, the transport and the customs before quoting.
Dimensions, weights and lifting points of every piece.
Port, vessel or trailer, route survey and permits.
Import, temporary admission, re-export or transit, agreed in advance.
Lifting and delivery to the site, piece by piece.
Related
Where this connects on the rest of the site.


